bathroom remodel floor walls first

Opt for floor installation first because it's often a messy process. A gutted room eliminates much of the dirt and grime associated with removing old carpet tile or wood flooring. 【Get Price】

In this case all below-floor-drain lines need to be installed first. Triple check the pipe placement before you pour the new concrete floor. The best way to ensure the plumbing pipes are installed in the correct location is to stake out the bathroom wall plates and suspend them in the work area with wood stakes. 【Get Price】

What you really want to do is tile the walls starting with the second row and work up from there. The first row near the floor should be reserved using a ledger or other space saver. And let that dry. Meanwhile install your floor tiles to the wall. And then finish by installing that final row of wall tiles so that it overlaps the floor properly. 【Get Price】

Removing the old tile flooring and fixtures can begin after the budget is set and design inspiration for bathroom remodeling is behind you. You may be tempted to start swinging a sledge hammer but demolition should be controlled and methodic. Be careful to not damage plumbing or electrical work during demolition. 【Get Price】

Wall/Floor Coverings w/ variable. Time to put down your subfloor hang your drywall and set your wall tile underlayment if applicable in that order. The variable is if you need to do any concrete work (floor leveling shower pan etc) do that before the drywall. Wet work. Mud tape texture and paint. 【Get Price】